Mechanical Workshop

WORKSHOP This building was originally planned as an air conditioning unit for the Coudé rooms. The unit was installed completely in 1960 with a high requirement of cooling water and an operator for all day long.
Therefore the air conditioning unit never was used and was removed in 1965.
The building was slightly changed and hosts the mechanical workshop since 1966.
WERKSTATT WERKSTATT